It was a flat roof which probably made it easier but if your ceiling joists are tied in sufficiently or can be packed against the roof spars then there is little reason why you can not do this to your roof.
Raise roof replace top plate.
Both boards seem to have some damage and should be replaced.
May have to get creative with how to attach top plate to both the studs and the roof truss.
It typically costs between 15 000 and 125 000 and up to raise a roof on a house removing replacing or moving plumbing and electrical work can increase price.
Actually did raise a garage roof in guildford last year to accommodate a new door.
I m thinking you should be able to just slightly raise that section to pull out and replace the top plate.
Additionally be sure to adhere to the specific fastening requirements in the 2018 irc table r802 5 2 for the rafter to rafter tie ceiling joist connections.
There are two 2x4 stacked on top of each other and i think there called top plate or upper wall plate.
On all the older mhs i ve worked on the truss was either stapled or screwed to the top plate.
Matching the exact length of the studs is vital.
Roof fascia board how to repair or replace rotten wood.
The cost breaks down to 40 materials and 60 labor if there s a problem that needs fixed roof repairs averages at 850.
Needless to say this will entail replacing the roof as well as the roofing material has to go above the insulation boards.
Cost of raising a roof on a house.
For example in a roof structure where the ridge height is 9 feet above the top of the support walls the maximum height that a rafter tie can be raised is 3 feet 3 9 1 3.
Now add collar ties from one side of the rafter to the other.
If these already exist nail a 2x4 to them directly under the 2x4 plate you nailed down before.
The time it will take to get your roof raised on your home will depend on how large of a roof you are raising and how ready your current roof or attic is for starting the project you should probably expect it would take four to six weeks from start to finish to have a fully finished project inside and out though the roof may be installed faster than that you ll need to take into consideration any finishing touches such as painting exterior walls insulation etc.
If the new stud is too short it will not support the plate and roof.
Raise floor joists with jacks to replace rotten sill plate.
If the new stud is too long it will push the top plate up and can affect the roof position.
Nationally the cost to replace or install a roof is about 8 000.
Once you have established how much the roof sag needs to be jacked up lay a 2x4 plate across the ceiling joists and nail directly under the ridge of the roof.
Attach rigid insulation boards over the top of the roof deck to keep it warmer so that moist air that hits it doesn t condense on it.
This is a hip roof design and it looks like i should be able to get to it in the attic if i crawl out to it.
Cut new lumber to the length of the rotted studs.